国产麻豆天美果冻无码视频,天美麻花星空高清免费观看完整版影视,天美传奇星空MV高清免费,天美传媒妇乱XXXXX视频,麻花星空无限传媒有限公司官网,麻花星空传剧原创MV在线,星空无痕MV免费视频观看,星空无限传媒免费观看电视剧,麻花天美星空MV免费观看完整版,星空传媒

您好,歡迎訪問山東燊赫通風(fēng)設(shè)備有限公司網(wǎng)站!

服務(wù)熱線

13210558111

螺旋風(fēng)管的安裝注意事項(xiàng)!

來源:http://www.heblc.com/     發(fā)布時(shí)間:2023-03-30  

螺旋風(fēng)管安裝是十分重要的環(huán)節(jié),通風(fēng)、空調(diào)工程的主要工作集中在風(fēng)管的安裝上。因此要做好掌握多功能消聲管的技術(shù)特性,熟悉施工圖,了解土建和其它工種同本工種的相關(guān)情況,核實(shí)風(fēng)管系統(tǒng)的標(biāo) 高,軸線、預(yù)留孔洞,預(yù)埋件等是否符合安裝條件。備足安裝用的各類輔助材料,準(zhǔn)備好吊裝機(jī)具和安裝用的其它工具,對風(fēng)管系統(tǒng)劃線定位等工作。
The installation of spiral air ducts is a very important link, and the main work of ventilation and air conditioning engineering focuses on the installation of air ducts. Therefore, it is necessary to master the technical characteristics of multi-functional silencing pipes, be familiar with construction drawings, understand the relevant conditions of civil engineering and other professional types of work with this type of work, and verify whether the elevation, axis, reserved holes, and embedded parts of the air duct system meet the installation conditions. Prepare various auxiliary materials for installation, hoisting machines and other tools for installation, and mark and position the air duct system.
風(fēng)管的組對:將成品或預(yù)制好的風(fēng)管運(yùn)安裝地點(diǎn),結(jié)合實(shí)際情況進(jìn)行檢查、復(fù)核,再按編號進(jìn)行排列,風(fēng)管系統(tǒng)的各部分尺寸和角度確認(rèn)準(zhǔn)確無誤后,即開始風(fēng)管組對工作。風(fēng)管各管段之間的連接采用法蘭連接,接口處要求嚴(yán)密不漏風(fēng)。
Air duct assembly: Transport the finished or prefabricated air duct to the installation site, inspect and recheck it based on the actual situation, and then arrange it according to the number. After confirming that the dimensions and angles of each part of the air duct system are correct, the air duct assembly work begins. The connection between each pipe section of the air duct shall be flange connected, and the interface shall be tight without air leakage.
山東通風(fēng)管道加工
一次吊裝風(fēng)管的長度要根據(jù)建筑物的條件,風(fēng)管的壁厚,吊裝方法和吊裝機(jī)具配備情況確定,組對好的風(fēng)管可把兩端的法蘭做為基準(zhǔn)點(diǎn),以中間法蘭為測點(diǎn),拉線測量風(fēng)管的連 接是否平直,偏差大時(shí)要進(jìn)行調(diào)整,吊裝前,要對風(fēng)管支、吊架,吊裝機(jī)具,選用吊裝機(jī)具的支、吊點(diǎn),是否正確、牢固進(jìn)行檢查,起吊前要仔細(xì)檢查,把桿、 滑輪、繩索等是否 固定,綁扎可靠并要吊裝范圍內(nèi)的各種不因素。起吊時(shí),要進(jìn)行試吊,當(dāng)離地200-300毫米時(shí),停止起升,再一次對吊裝機(jī)具進(jìn)行一次檢查,確認(rèn)無誤后,繼續(xù)起升到所需高度。把風(fēng)管固定在支、吊架上之后,才能解開繩索,拆移吊裝 機(jī)具。
The length of the primary air duct to be lifted should be determined based on the conditions of the building, the wall thickness of the air duct, the lifting method, and the allocation of lifting equipment. After the air duct is assembled, the flanges at both ends can be used as reference points, and the intermediate flange can be used as the measuring point. Draw a line to measure whether the connection of the air duct is straight. If there is a large deviation, it should be adjusted. Before lifting, the support and hanger of the air duct, the lifting equipment, and the support and lifting points of the lifting equipment should be selected to determine whether they are correct Check firmly. Before lifting, carefully check whether the rods, pulleys, ropes, etc. are fixed, and whether the binding is reliable. All unsafe factors within the lifting range must be removed. During lifting, a trial lifting should be carried out. When 200-300mm above the ground, the lifting should be stopped, and a comprehensive inspection of the lifting equipment should be conducted again. After confirming that there is no error, the lifting should continue to the required height. After fixing the air duct on the support and hanger, the rope can be loosened and the lifting equipment can be removed.
水平干管經(jīng)找平找正并固定在支、吊架上后,就可進(jìn)行支管的安裝。立管可在水平干管安裝前進(jìn)行安裝,支架間距不應(yīng)大于4米,每根立管固定件不應(yīng)少于二個(gè)。風(fēng)管水平安裝,水平度的允許偏差每米不應(yīng)大于3毫米,總偏差不應(yīng)大于20毫米,風(fēng)管垂 直安裝,垂直度的允許偏差每米不應(yīng)大于2毫米,總偏差不應(yīng)大于20毫米。
After leveling and aligning the horizontal main pipe and fixing it on the supports and hangers, the branch pipe can be installed. The riser can be installed before the installation of the horizontal main pipe. The spacing between supports should not be greater than 4 meters, and each riser should have at least two fasteners. For horizontal installation of air ducts, the allowable deviation for levelness should not be greater than 3mm per meter, and the total deviation should not be greater than 20mm. For vertical installation of air ducts, the allowable deviation for perpendicularity should not be greater than 2mm per meter, and the total deviation should not be greater than 20mm.

上一篇:酒店及餐飲廚房排煙常見問題的解決
下一篇:廚房排煙管道系統(tǒng)制作材質(zhì)!

国产精品麻豆久久一区无码片| 免费试看视频| 午夜福利欧美| 五月丁香啪啪| 无码日韩人妻精品久久蜜桃网站 | 日日夜夜天天| 性爱视频中文字幕| 久久99精品久久久久久琪琪| 国产精品一| 激情免费AV| 色偷偷成人一区二区三区| 自慰网站在线| 香蕉视频lite| 久久久久成人网| 精品无码国产AV一区二区三区 | 日本潮喷视频| 国产黄片一级| 国产喷白浆一区二区三区| 福利久久久| 欧美精品H| 日韩精品 - 色哟哟| 亚洲乱伦小说网| 熟妇AV在线| 国产精品无码少妇久久| 狠狠狠狠狠干| 日韩av在线网站| 免费人妻精品一区二区三区| 欧洲熟妇的性久久久久久| 精品久久久久久久久久久国产字幕| 久久亚洲国产精品| 欧美日韩天堂| 中文字幕一区二区三区精华液| 好吊视频一区二区三区| 国产精品久久久久久无码红治院| 久久久久亚洲AV无码专区| www.99色| 大香蕉97| 欧美另类熟妇| 久久精品国产亚洲AV高清色欲| 天堂成人在线| 亚洲综合小说网|